Architect Vault
Every dossier documents the exact hardware, wiring, firmware, and compliance choreography we deploy inside private estates. Built for CIOs who need receipts and for principals who demand sovereignty.
Filter by format
152 of 152 entries visible
Primary compute + storage spine for estate vaults that need 400TB raw density, inline GPU acceleration, and dual-fabric redundancy without introducing cloud trust.
Sustained Throughput
84 GB/s
400GbE spine that segments estates into blast-proof cells with line-rate microsegmentation, hardware ACLs, and deterministic telemetry for compliance officers.
ACL Commit
<300 ms
Multi-site archive blueprint that combines immutable ZFS, S3-compatible air gap, and witness-signed retention controls so managing partners sleep at night.
Retention Enforcement
100%
Dual-socket 2U chassis optimized for parallel inference workloads with 8x A100 80GB GPUs and NVLink mesh for multi-tenant AI estates.
Inference Throughput
12,000 tok/s
Open-source hyperconverged platform delivering enterprise storage, VM orchestration, and S3-compatible object services without cloud lock-in.
Effective Capacity
384 TB
Open-source firewall platform delivering enterprise-grade network segmentation, VPN gateways, and intrusion detection for on-prem estates.
Throughput
10 Gbps
Open-source virtualization platform with high availability, live migration, and Ceph storage integration for resilient on-prem clouds.
VM Density
240 VMs
Software-defined networking with centralized management, captive portals, and RF optimization for estate-wide wireless coverage.
Coverage Area
12,000 sq ft
Enterprise backup platform with instant VM recovery, immutable repositories, and compliance-ready retention policies.
Recovery Point
15 min
Modern VPN protocol with cryptokey routing, sub-millisecond handshakes, and zero-config roaming for distributed estates.
Handshake Time
< 100 ms
Multi-node GPU cluster optimized for large-scale model training with NVLink, InfiniBand, and distributed storage.
Aggregate FP16
2.4 PFLOPS
Turnkey network-attached storage with RAID, snapshots, and cloud sync for small offices replacing unreliable cloud subscriptions.
Total Capacity
64 TB
Dual-socket 2U server optimized for virtualization, database workloads, and mid-tier compute with enterprise support.
Core Count
128 cores
Enterprise-grade layer 3 switch with stacking, PoE++, and programmable network automation for campus estates.
Switching Capacity
880 Gbps
Cloud-managed access layer switching with VSX redundancy, dynamic segmentation, and AI-powered analytics.
Port Count
48x 1GbE
Unified threat management appliance with SSL inspection, SD-WAN, and integrated security fabric for distributed estates.
Threat Blocking
99.7%
High-performance NGFW with App-ID, threat prevention, and zero-trust enforcement for regulated estates.
Threat Prevention
64 Gbps
12-bay NAS optimized for Veeam/Commvault backup repositories with ZFS, snapshots, and 25GbE connectivity.
Backup Speed
2.4 GB/s
Mid-tier unified storage with NFS/SMB/iSCSI, auto-tiering, and SnapMirror replication for enterprise estates.
Effective Capacity
280 TB
All-flash array with NVMe, inline deduplication, and Evergreen subscription for non-disruptive upgrades.
IOPS
2.4M
Predictive flash array with InfoSight AI, auto-tiering, and cloud-based analytics for proactive issue resolution.
Uptime Guarantee
99.9999%
High-density 100GbE spine switch with EVPN/VXLAN, telemetry streaming, and programmable automation.
Switching Capacity
12.8 Tbps
Low-latency top-of-rack switch with deep buffers, CloudVision integration, and zero-touch provisioning.
Latency
350 ns
Data Processing Unit offloading networking, security, and storage functions from host CPUs with hardware acceleration.
Crypto Throughput
200 Gbps
Open-source firewall platform with IDS/IPS, VPN, and traffic shaping for cost-effective estate security.
Throughput
5 Gbps
High-performance router with advanced routing protocols, QoS, and scripting for complex estate topologies.
Routing Performance
18 Mpps
Enterprise-grade router with Vyatta OS, hardware offload, and deep packet inspection for small-to-mid estates.
Routing Throughput
2 Gbps
Low-latency satellite internet providing redundant WAN connectivity for remote estates without fiber access.
Latency
25 ms
Cellular failover router with dual-modem redundancy and cloud management for business-critical uptime.
Failover Time
< 10s
Enterprise UPS with online double-conversion, hot-swappable batteries, and network management card.
Runtime
18 min
Compact 3U UPS with energy-efficient operation, graphical LCD, and integrated PDU.
Runtime
12 min
Network-managed PDU with per-outlet switching, current monitoring, and environmental sensors.
Outlet Count
24x C13
Enterprise PDU with automatic transfer switch, hot-swap components, and Sentry Power Manager.
Failover Time
< 4 ms
In-row cooling unit with variable-speed fans, hot-aisle containment, and predictive maintenance.
Cooling Capacity
40 kW
Enterprise-grade Server Hardware delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade High-Density Compute delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Enterprise Server delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade AMD EPYC Server delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Workstation Server delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade NAS Appliance delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade All-Flash Array delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Parallel Filesystem delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Software-Defined Storage delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Object Storage delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Object Storage delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade Petascale Object Store delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Backup Appliance delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Cloud Data Management delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Enterprise Backup delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Backup Software delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade Continuous DR delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade DR Orchestration delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Hyperconverged delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Edge HCI delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade Hyperconverged delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Software-Defined Storage delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Core Switch delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Access Switch delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade Data Center Switch delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade ADC Appliance delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Load Balancer delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Load Balancer delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade Web Application Proxy delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade DNS/DHCP/IPAM delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade DDI Platform delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade DNS Server delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade Log Management delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade SIEM Platform delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Log Analytics delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Log Management delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade Network Monitoring delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Infrastructure Monitoring delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade Monitoring Platform delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Metrics Stack delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade Observability SaaS delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Application Monitoring delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade APM Platform delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Full-Stack Observability delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade Network Intelligence delivering reliability, performance, and compliance readiness for Architect-tier estates.
Engineering Engagement
8-16 weeks
Enterprise-grade WAN Optimization delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade SD-WAN Platform delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Cloud-Managed WAN delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Enterprise-grade Software-Defined WAN delivering reliability, performance, and compliance readiness for Estate-tier estates.
Implementation Cycle
4-8 weeks
Enterprise-grade Multi-WAN Router delivering reliability, performance, and compliance readiness for Foundation-tier estates.
Deployment Time
2-4 weeks
Production-hardened integration blueprint combining Kubernetes with estate infrastructure for seamless deployment and operations.
Engineering Engagement
8-16 weeks
Production-hardened integration blueprint combining Docker with estate infrastructure for seamless deployment and operations.
Implementation Cycle
4-8 weeks
Production-hardened integration blueprint combining Rancher with estate infrastructure for seamless deployment and operations.
Engineering Engagement
8-16 weeks
Production-hardened integration blueprint combining OpenShift with estate infrastructure for seamless deployment and operations.
Engineering Engagement
8-16 weeks
Production-hardened integration blueprint combining Nomad with estate infrastructure for seamless deployment and operations.
Implementation Cycle
4-8 weeks
Production-hardened integration blueprint combining Ansible with estate infrastructure for seamless deployment and operations.
Implementation Cycle
4-8 weeks
Production-hardened integration blueprint combining Terraform with estate infrastructure for seamless deployment and operations.
Engineering Engagement
8-16 weeks
Production-hardened integration blueprint combining GitLab with estate infrastructure for seamless deployment and operations.
Deployment Time
2-4 weeks
Production-hardened integration blueprint combining Jenkins with estate infrastructure for seamless deployment and operations.
Implementation Cycle
4-8 weeks
Production-hardened integration blueprint combining HashiCorp with estate infrastructure for seamless deployment and operations.
Engineering Engagement
8-16 weeks
Production-hardened integration blueprint combining CyberArk with estate infrastructure for seamless deployment and operations.
Engineering Engagement
8-16 weeks
Production-hardened integration blueprint combining Thycotic with estate infrastructure for seamless deployment and operations.
Implementation Cycle
4-8 weeks
Production-hardened integration blueprint combining 1Password with estate infrastructure for seamless deployment and operations.
Deployment Time
2-4 weeks
Production-hardened integration blueprint combining Active with estate infrastructure for seamless deployment and operations.
Deployment Time
2-4 weeks
Production-hardened integration blueprint combining FreeIPA with estate infrastructure for seamless deployment and operations.
Deployment Time
2-4 weeks
Production-hardened integration blueprint combining Okta with estate infrastructure for seamless deployment and operations.
Implementation Cycle
4-8 weeks
Production-hardened integration blueprint combining Duo with estate infrastructure for seamless deployment and operations.
Deployment Time
2-4 weeks
Production-hardened integration blueprint combining YubiKey with estate infrastructure for seamless deployment and operations.
Implementation Cycle
4-8 weeks
Production-hardened integration blueprint combining Ping with estate infrastructure for seamless deployment and operations.
Engineering Engagement
8-16 weeks
Production-hardened integration blueprint combining Keycloak with estate infrastructure for seamless deployment and operations.
Deployment Time
2-4 weeks
Step-by-step implementation guide for hipaa technical safeguards checklist with documented procedures, compliance checklists, and estate-specific customization.
Implementation Cycle
4-8 weeks
Step-by-step implementation guide for soc 2 type ii evidence gathering with documented procedures, compliance checklists, and estate-specific customization.
Engineering Engagement
8-16 weeks
Step-by-step implementation guide for pci-dss network segmentation with documented procedures, compliance checklists, and estate-specific customization.
Implementation Cycle
4-8 weeks
Step-by-step implementation guide for itar cui access controls with documented procedures, compliance checklists, and estate-specific customization.
Engineering Engagement
8-16 weeks
Step-by-step implementation guide for nist 800-171 implementation with documented procedures, compliance checklists, and estate-specific customization.
Engineering Engagement
8-16 weeks
Step-by-step implementation guide for gdpr data subject rights with documented procedures, compliance checklists, and estate-specific customization.
Deployment Time
2-4 weeks
Step-by-step implementation guide for ransomware recovery playbook with documented procedures, compliance checklists, and estate-specific customization.
Implementation Cycle
4-8 weeks
Step-by-step implementation guide for zero-trust architecture design with documented procedures, compliance checklists, and estate-specific customization.
Engineering Engagement
8-16 weeks
Step-by-step implementation guide for incident response runbook with documented procedures, compliance checklists, and estate-specific customization.
Implementation Cycle
4-8 weeks
Step-by-step implementation guide for disaster recovery testing with documented procedures, compliance checklists, and estate-specific customization.
Implementation Cycle
4-8 weeks
Step-by-step implementation guide for backup validation procedures with documented procedures, compliance checklists, and estate-specific customization.
Deployment Time
2-4 weeks
Step-by-step implementation guide for network documentation standards with documented procedures, compliance checklists, and estate-specific customization.
Deployment Time
2-4 weeks
Step-by-step implementation guide for change management workflow with documented procedures, compliance checklists, and estate-specific customization.
Implementation Cycle
4-8 weeks
Step-by-step implementation guide for asset inventory tracking with documented procedures, compliance checklists, and estate-specific customization.
Deployment Time
2-4 weeks
Step-by-step implementation guide for vulnerability management program with documented procedures, compliance checklists, and estate-specific customization.
Implementation Cycle
4-8 weeks
Step-by-step implementation guide for patch management policy with documented procedures, compliance checklists, and estate-specific customization.
Deployment Time
2-4 weeks
Step-by-step implementation guide for access review process with documented procedures, compliance checklists, and estate-specific customization.
Implementation Cycle
4-8 weeks
Step-by-step implementation guide for encryption key lifecycle with documented procedures, compliance checklists, and estate-specific customization.
Engineering Engagement
8-16 weeks
Step-by-step implementation guide for data retention schedule with documented procedures, compliance checklists, and estate-specific customization.
Implementation Cycle
4-8 weeks
Step-by-step implementation guide for physical security audit with documented procedures, compliance checklists, and estate-specific customization.
Engineering Engagement
8-16 weeks
Production-ready Ubiquiti UniFi Protect NVR delivering enterprise features with estate integration and compliance alignment.
Setup Time
1-3 weeks
Production-ready Milestone XProtect VMS delivering enterprise features with estate integration and compliance alignment.
Integration Time
3-6 weeks
Production-ready Verkada Enterprise Cameras delivering enterprise features with estate integration and compliance alignment.
Deployment Cycle
6-12 weeks
Production-ready Genetec Security Center delivering enterprise features with estate integration and compliance alignment.
Deployment Cycle
6-12 weeks
Production-ready Axis P3248-LVE Cameras delivering enterprise features with estate integration and compliance alignment.
Integration Time
3-6 weeks
Production-ready Hikvision NVR Enterprise delivering enterprise features with estate integration and compliance alignment.
Setup Time
1-3 weeks
Turnkey integration blueprint for Lenel OnGuard Access Control with estate infrastructure, automation, and documented procedures.
Deployment Cycle
6-12 weeks
Turnkey integration blueprint for HID VertX Access Management with estate infrastructure, automation, and documented procedures.
Integration Time
3-6 weeks
Production-ready Salto KS Access Control delivering enterprise features with estate integration and compliance alignment.
Setup Time
1-3 weeks
Turnkey integration blueprint for Brivo Cloud Access with estate infrastructure, automation, and documented procedures.
Setup Time
1-3 weeks
Turnkey integration blueprint for Honeywell MAXPRO Cloud with estate infrastructure, automation, and documented procedures.
Integration Time
3-6 weeks
Turnkey integration blueprint for Avigilon Alta Cloud Video with estate infrastructure, automation, and documented procedures.
Setup Time
1-3 weeks
Turnkey integration blueprint for Cisco Catalyst Center with estate infrastructure, automation, and documented procedures.
Deployment Cycle
6-12 weeks
Turnkey integration blueprint for Meraki Dashboard API with estate infrastructure, automation, and documented procedures.
Setup Time
1-3 weeks
Turnkey integration blueprint for Aruba Central Cloud with estate infrastructure, automation, and documented procedures.
Setup Time
1-3 weeks
Turnkey integration blueprint for Juniper Mist AI with estate infrastructure, automation, and documented procedures.
Integration Time
3-6 weeks
Turnkey integration blueprint for Extreme Cloud IQ with estate infrastructure, automation, and documented procedures.
Setup Time
1-3 weeks
Turnkey integration blueprint for Ruckus Cloud WiFi with estate infrastructure, automation, and documented procedures.
Setup Time
1-3 weeks
Turnkey integration blueprint for Cambium cnMaestro with estate infrastructure, automation, and documented procedures.
Setup Time
1-3 weeks
Turnkey integration blueprint for ServiceNow ITSM Platform with estate infrastructure, automation, and documented procedures.
Deployment Cycle
6-12 weeks
Turnkey integration blueprint for Jira Service Management with estate infrastructure, automation, and documented procedures.
Integration Time
3-6 weeks
Turnkey integration blueprint for Freshservice IT Helpdesk with estate infrastructure, automation, and documented procedures.
Setup Time
1-3 weeks
Turnkey integration blueprint for ManageEngine ServiceDesk with estate infrastructure, automation, and documented procedures.
Integration Time
3-6 weeks
Turnkey integration blueprint for Ivanti Service Manager with estate infrastructure, automation, and documented procedures.
Deployment Cycle
6-12 weeks
Turnkey integration blueprint for Cherwell Service Management with estate infrastructure, automation, and documented procedures.
Integration Time
3-6 weeks
Turnkey integration blueprint for BMC Helix ITSM with estate infrastructure, automation, and documented procedures.
Deployment Cycle
6-12 weeks
Turnkey integration blueprint for SysAid IT Asset Management with estate infrastructure, automation, and documented procedures.
Setup Time
1-3 weeks
Turnkey integration blueprint for Snipe-IT Asset Tracking with estate infrastructure, automation, and documented procedures.
Setup Time
1-3 weeks